Parapara Hydroelectric Scheme Homepage       Environmental Effects Assessment.. page 5             contents

Figure 2  Parapara River Lower Catchment. Road boundaries (red) and property boundaries (mauve) are shown. Solid orange line is re-instated and new roading. Yellow linesindicate the proposed pipeline route. The Kahurangi National Park boundary is the black line to the east.

return to top  /   previous page  /   next page