Plate IV. Power generator site in the mid foreground. View looking downstream with Parapara River on right below Gorge on the alluvial plain of Glen.

Removal and disturbance of regenerating bush in this area will be minimised to a six metre wide strip around the building and two metres either side of the pipeline and access road route.

See also Plate VIII, Page 19.

No hazardous substances will be stored or processed as part of this scheme and any oils or acids in batteries will be contained within their respective devices.

The rehabilitation or the construction of these aspects of the scheme involves the following components in the respective catchments: -

Figure 4. Components of Parapara Power Scheme construction.